"Produced water - volume"

"The increase in produced water from the Gloucester Gas Project was due to two pilot well dewatering programs that commenced in FY2014."

"Produced water  (kL)",FY2010,FY2011,FY2012,FY2013,FY2014
"Camden Gas Project","2,414","2,987","4,728","4,975","3,464"
"Gloucester Gas Project","3,791",985,-,"1,280","4,729"
"Hunter Gas Project",331,310,-,-,-
"Galilee Gas Project","91,417","154,192","199,335","87,600","114,100"

Notes
"Produced water comprises natural groundwater generated from coal seams during flow testing and production dewatering.  It does not include other water streams (drill water, fracture stimulation/flowback water and brine water) that usually require separate water management."
"Monitoring data for water production levels is used for Gloucester, Hunter and Galilee gas projects. Produced water data for Camden Gas Project is calculated from recorded volumes removed from the well sites."
"Data does not include produced water volumes for AGL conventional oil and gas projects in the Surat and Cooper Basin."
"No water was produced from the Hunter Gas Project during FY2013 or FY2014 as no pilot testing of production was undertaken."
"GRI Reference: OG-5"

